The Pier 27 New Cruise Ship Terminal project will convert the 178,000 square feet existing pier and maritime shed into a new primary, single berth cruise ship terminal. It also includes the development if a plaza located along the Embarcadero between Pier 27 and 29 and modifications to the street and sidewalk configuration along the Embarcadero.
TECI Scope includes: Topographic Survey; Demolition; Utility layout and design on water-side; Grading; Civil Portion of Specifications; Storm water Management Requirement.