Geary Road Bridge

  • Location: Sunol, CA
  • Role: QSP
  • Agency: San Francisco Public Utilities Commission
  • Final Cost: $3,500,000.00

The project is the   design and construction of a new concrete and steel bridge to replace the   existing unreliable wooden Geary Bridge located in the Sunol Regional Wilderness  Area. As a QSP, TECI provided assistance for the weekly and as-needed storm water inspection services (weekly BMP inspections, as-needed pre, during, and post qualifying rain event inspections).