Geary Road Bridge
- Location: Sunol, CA
- Role: QSP
- Agency: San Francisco Public Utilities Commission
- Final Cost: $3,500,000.00
The project is the design and construction of a new concrete and steel bridge to replace the existing unreliable wooden Geary Bridge located in the Sunol Regional Wilderness Area. As a QSP, TECI provided assistance for the weekly and as-needed storm water inspection services (weekly BMP inspections, as-needed pre, during, and post qualifying rain event inspections).