New SFPUC Administrative Building (525 Golden Gate)

assets/Uploads/_resampled/fullsize-525-Golden-Gate.JPG
  • Location:
    525 Golden Gate Ave., San Francisco, CA
  • Role: Civil Engineer of Record
  • Agency: SFPUC / SFDPW-BPM
  • Final Cost: $190,000,000.00

This project is the construction of a new SFPUC Administrative Building. It is a 13-story, 277,000 sq ft. building that will house the SFPUC headquarters. This building aims to be the greenest office building in the country and achieve a LEED Platinum Certification from the US Green Building Council. The sustainable elements in this building includes: a "living machine" situated in the lobby which will act as a water treatment plant using natural resources, wind turbines, 200kw photovoltaic array located on the rooftop, and a concrete structural frame that can withstand tremendous seismic events.

TECI scope includes: Boundary & Easement Survey; Supplemental Topographic survey; Street improvements; Site grading, paving and utility coordination and design; coordination and integration of "living machine" system to treat grey water and black water.