Balboa Street Pavement Renovation

  • Location: San Francisco, CA
  • Role: Topographic Survey/ Civil 
  • Agency:  San Francisco Department of Public Works Bureau of Engineering
  • Final Cost: $3,400,000.00

As part of the SFDPW As Needed Civil/Structural Engineering Services contract, TECI was contracted to provide curb ramp design services for intersections of Balboa and 48th Ave to La Playa. It includes 8 intersections, 32 returns and 64 ramps. It also includes 3 bulb-outs, a traffic calming measure recently implemented by the SFMTA. TECI also performed topographic survey for 30 intersections – from Balboa and Park Presidio Blvd up to La Playa.