Balboa Street Pavement Renovation
- Location: San Francisco, CA
- Role: Topographic Survey/ Civil
- Agency: San Francisco Department of Public Works Bureau of Engineering
- Final Cost: $3,400,000.00
As part of the SFDPW As Needed Civil/Structural Engineering Services contract, TECI was contracted to provide curb ramp design services for intersections of Balboa and 48th Ave to La Playa. It includes 8 intersections, 32 returns and 64 ramps. It also includes 3 bulb-outs, a traffic calming measure recently implemented by the SFMTA. TECI also performed topographic survey for 30 intersections – from Balboa and Park Presidio Blvd up to La Playa.